Our Work In Action

FEATURED
PROJECTS

Across Indonesia, our teams deliver complex construction, mechanical piping, and industrial projects — built to last, executed with precision.

0+
Projects Done
0+
Years Experience
0+
Field Workers
SCROLL
Filter:
OKI Pulp & Paper Mills - PowerChina Project
Infrastructure Mechanical
View Details
Ogan Komering Ilir, Sumatera Selatan

OKI Pulp & Paper Mills — PowerChina Project

Comprehensive structural and mechanical works at one of Indonesia's largest pulp mills. Executed in collaboration with PowerChina, involving full workforce mobilization and coordinated daily operations at Sungai Batang site.

Industrial Pump & Piping Installation
Mechanical
View Details
Industrial Site, Indonesia

Industrial Pump & Piping Installation

Precision installation of high-capacity electric pumps and insulated piping systems, ensuring optimal fluid flow and system efficiency across the facility.

Pipe Fabrication Workshop
Fabrication
View Details
Workshop, Indonesia

Large-Scale Pipe Fabrication

Manufacturing hundreds of structural pipe units in our dedicated workshop, with precision welding and quality control before deployment to construction sites.

Storage Tank Construction Briefing
Tank
View Details
Industrial Site

Tank Construction — Safety Briefing

Pre-shift safety briefing for our tank construction team, ensuring every worker is equipped with proper PPE and briefed on daily hazard protocols.

Heavy Hoisting & Rigging Operations
Mechanical
View Details
Port/Marine Structure

Heavy Hoisting & Rigging Operations

Expert team performing certified rigging and hoisting at height, carefully lifting and positioning structural beams in constrained elevated environments.

Large Scale Tank Erection with Crane
Tank
View Details
Industrial Zone

Large Scale Tank Erection

Coordinated erection of massive cylindrical storage tanks using a heavy-duty mobile crane, with personnel operating at heights above scaffolding platforms.

Industrial Processing Towers
Infrastructure
View Details
Industrial Plant

Industrial Processing Tower Installation

Installation of multi-level stainless steel processing towers with crane-assisted lifting, complete with interconnecting pipework and access walkways.

Integrated Plant Construction Site
Construction Infrastructure
View Details
Industrial Complex, Indonesia

Integrated Chemical Plant Construction

Full-scope construction of an integrated chemical processing plant including structural steel erection, vessel installation, and piping tie-ins. The project involved extensive equipment staging and coordinated multi-discipline teams across the site.

On-Site Technical Briefing
Mechanical
View Details
Jiangxi Electric, Industrial Plant

On-Site Technical Briefing

Supervisor-led technical coordination session inside a live mechanical plant facility, ensuring alignment between multi-discipline teams on piping and equipment installation.

PowerChina JEPCC Team Coordination
Infrastructure
View Details
PowerChina — JEPCC Project

PowerChina JEPCC — Team Coordination

Multi-team field coordination between GSA personnel and PowerChina JEPCC engineers, reviewing technical drawings and planning daily work sequences for mechanical erection.

Site Coordination and Civil Works
Construction
View Details
Civil Construction Site

Civil Works & Site Coordination

Ground-level coordination meeting during active civil works, with team leads reviewing structural progress against construction milestones in an open industrial building.

Large Tank Construction with Scaffolding
Tank
View Details
Industrial Plant Site

Large Storage Tank — Shell Construction

Full-shell construction of an oversized industrial storage tank, built course-by-course using full scaffolding systems. Green-painted roof structure and ladderways completed simultaneously.

Tall Vessel Lifting by Crane
Tank Mechanical
View Details
Heavy Lift Site, Indonesia

Vertical Vessel Lifting & Installation

Spectacular vertical lift of a tall industrial pressure vessel using a heavy-duty crawler crane. The operation required precise rigging planning, structural integrity checks, and coordinated team execution to achieve a clean, safe vertical installation at the designated foundation pad.

Multiple Tank Cluster Construction
Tank Construction
View Details
Industrial Complex, Indonesia

Multi-Tank Cluster Construction

Simultaneous erection of multiple large cylindrical storage tanks within an active industrial complex, coordinated alongside building construction and crane operations — all within a tight site layout.

Large Steel Tank Cluster with Scaffolding
Tank
View Details
Industrial Plant Site

Steel Tank Cluster — Shell Fabrication

Precision shell-course welding and erection of three large-diameter steel storage tanks side-by-side, with full bamboo and tube-and-coupler scaffolding throughout the construction phase.

Tank Roof Lifting Operation
Tank Mechanical
View Details
Heavy Lift Site

Tank Roof Lowering Operation

Crane-assisted lowering of a completed tank roof section onto an open tank shell, with workers positioned inside to guide exact seating alignment — a high-precision lift requiring careful load control.

Tank Nozzle Installation Works
Mechanical
View Details
Site — January 2026

Tank Nozzle & Manway Installation

High-elevation installation of large manway nozzles on a storage tank shell, with workers wearing full fall-arrest harnesses as they weld and fit flanged connections at height.

Aerial View Tank Roof Installation
Tank
View Details
Industrial Plant

Tank Roof Installation — Aerial View

Top-down view of a green-painted floating tank roof being lowered by crane slings into position inside the open tank shell, with crew guiding the structure into precise alignment.

Aerial View of Multiple Tank Tops
Tank
View Details
Air Sugihan, Sumatera Selatan — Jan 2026

Multi-Tank Roof Top — Progress Overview

Aerial overview of multiple completed tank roofs (green-painted), showing the scale and density of simultaneous tank construction operations across the site in Air Sugihan.

Tank Rim and Crane Hook Operation
Tank Mechanical
View Details
Industrial Site, Indonesia

Tank Roof Edge — Crane Positioning

Close-up of a large tank during roof installation, with crane hook and slings positioned to set the curved green-painted rim plate — worker on top providing hand signals to the crane operator.

Tank Roof Disc Lifted Mid-Air by Crane
Tank Mechanical
View Details
OKI Complex, Sumatera Selatan

Tank Roof Disc — Mid-Air Crane Lift

A dramatic crane lift captures the massive green-painted tank roof disc suspended fully in mid-air before being lowered onto the waiting tank shell below. The operation required multi-point sling rigging to keep the large flat disc level throughout the lift.

6-Tank Cluster Aerial View with Workers
Tank Construction
View Details
Large-Scale Industrial Plant, Sumatera

6-Tank Complex — Full Aerial View

Impressive aerial photograph showing six large storage tanks simultaneously under construction inside a reinforced concrete plant structure — with workers visible atop the green-painted roofs, showcasing the scale and complexity of the project execution.

JEPCC Piping Team at Work
Mechanical Infrastructure
View Details
PowerChina JEPCC — Jan 2026

JEPCC Piping & Structural Works

GSA field crew working alongside PowerChina JEPCC engineers on elevated piping installation. Worker mounted on scaffolding pipe while team below coordinates positioning of structural steel members in an active green-framed plant structure.

Industrial Plant Operation at Dusk
Infrastructure
View Details
Industrial Plant Site

Plant Commissioning & Operation

Dusk view of an active industrial plant with smoke emissions, showcasing the scale of the facility after successful mechanical and structural commissioning by our teams.

Half-Roof Section Crane Lift
Tank Mechanical
View Details
Heavy Lift Operations

Semi-Circle Tank Roof Lifting

Precision lifting of a massive semi-circular tank roof plate segment. The multi-point rigging configuration ensures the asymmetrical plate remains perfectly balanced during the long lift over the scaffolding structure.

Structural Beam Crane Lifting
Construction
View Details
Plant Structural Erection

Heavy Structural Beam Installation

Mobile crane lifting a large pre-fabricated green structural steel beam off a flatbed trailer for installation into the main plant structure, coordinating logistics and heavy lifting in a tight site area.

Tall Steel Column Vertical Lift
Mechanical Tank
View Details
Equipment Erection Site

Vertical Column & Stack Erection

A highly demanding vertical lift of a tall, narrow steel column structure from its transport trailer. The crane operator and rigging team executed a flawless upending procedure to transition the piece from horizontal transport to vertical installation.

Workers Handling Large Pipe Elbows
Mechanical
View Details
Pipe Fabrication Laydown

Large Diameter Piping Handling

Site crews manually adjusting and preparing large diameter stainless steel pipe elbows at the laydown yard, staging materials for the next phase of the mechanical piping installation sequence.

Workers on High Tank Scaffolding
Tank Construction
View Details
Elevated Tank Structure

High Elevation Scaffold Works

Workers safely positioned on narrow, elevated scaffolding platforms near the top rim of a large storage tank, executing precision mechanical works directly beneath overhead piping and conveyor infrastructure.

Wide View Tanks and Pipe Rack
Infrastructure Tank
View Details
Industrial Complex Expansion

Integrated Tank & Pipe Rack Construction

Wide perspective showcasing complex concurrent construction: multiple large-scale tanks fully wrapped in scaffolding, being built simultaneously beneath a massive structural steel pipe rack and conveyor system. Demonstrates our capacity for high-density, multi-discipline site coordination.

Three Tanks Under Construction
Tank
View Details
Tank Farm Area

Triple Tank Block Erection

Progress view of three massive cylindrical storage tanks side-by-side. The far right tank has successfully received its green structural roof, while the others remain in the shell welding and scaffolding phase, supported by heavy crane logistics.

Tank Fabrication Ground Level
Mechanical
View Details
Ground Fabrication Area

Ground-Level Steel Fabrication

Workers engaged in welding and fabrication tasks on the tank shell exterior, while large curved steel plate sections and a manifold of industrial welding gas cylinders are staged in the foreground for upcoming assembly.

Green Steel Beam Transport
Construction
View Details
Site Logistics

Heavy Material Logistics & Transport

A massive, pre-fabricated green structural steel beam securely loaded on a heavy-duty flatbed trailer, navigating challenging muddy site conditions to deliver critical materials directly to the erection zone.

Site Infrastructure and Pipe Rack
Infrastructure
View Details
Main Plant Facility

Plant Building & Pipe Rack Infrastructure

General site overview showcasing the integration of the main concrete plant building alongside a massive, multi-tiered structural steel pipe rack and conveyor gallery, with piping materials staged in the foreground.

Tank Internal Baffle Installation
Tank Mechanical
View Details
Tank Interior Works

Internal Tank Stiffener Installation

Internal view of a massive storage tank under construction, detailing the installation of vertical steel stiffeners (baffles) along the curved inner shell wall, supported by an extensive internal scaffolding system.

Worker Guiding Plate Lift
Mechanical
View Details
Erection Site

Crane Lifting & Tagline Control

A rigger providing critical ground guidance and tagline control while a mobile crane carefully hoists a large steel plate section, demonstrating strict safety protocols during heavy lifting operations.

Internal Tank Shell Welding
Tank
View Details
Confined Space Works

Internal Tank Shell Welding

A team of three specialists working in tandem on an internal scaffold platform, performing high-quality grinding and welding on horizontal shell plate seams from inside the tank enclosure.

Chain Block Plate Hoisting
Mechanical
View Details
Tank Interior Assembly

Manual Chain Block Hoisting

Riggers utilizing heavy-duty manual chain blocks suspended from temporary supports to carefully lift and align a heavy vertical steel plate into exact position during intricate internal tank assembly.

Top-down View Scaffolding Works
Tank
View Details
Tank Exterior Shell

Exterior Scaffold Inspection

A striking top-down perspective capturing technicians securely harnessed on high-level scaffolding, conducting inspections and finalizing exterior tank shell alignments high above the ground.

Massive Tank Interior
Tank Construction
View Details
Mega Storage Tank Interior

Massive Scale Tank Interior Erection

Breathtaking internal view illustrating the colossal scale of our mega storage tanks. The extensive multi-level scaffolding rings provide access for welding crews to complete the circumferential shell joints in this massive enclosed environment.

Internal Tank Welding Team
Mechanical Tank
View Details
Internal Confined Space

Internal Joint Welding & Finishing

Specialized welders equipped with safety harnesses and protective gear carefully executing multi-pass welding and grinding on horizontal shell plate seams from an elevated interior scaffold platform.

Dual Mobile Cranes Operations
Infrastructure Construction
View Details
Tank Farm Logistics Center

Dual Mobile Crane Fleet Operations

Two heavy-duty green mobile cranes operating simultaneously in a tight logistics corridor between multiple completed storage tanks, demonstrating our high-capacity lifting resources and precise fleet coordination.

Excavator Earthworks
Infrastructure
View Details
Site Earthworks & Drainage

Site Earthworks & Drainage Trenching

SANY excavator performing critical earthmoving and drainage trenching operations during the civil groundwork phase. Managing challenging, muddy site conditions to establish proper foundations for subsequent structural works.

Large Pipes and Gantry Crane
Mechanical Infrastructure
View Details
Site Laydown Area

Large Diameter Piping Logistics

Massive black coated steel pipes staged at the laydown yard, ready for installation. Heavy lifting operations are supported by a large orange gantry crane in the background, essential for managing these industrial-scale materials.

Complex Industrial Piping Interior
Mechanical Tank
View Details
Plant Process Area

Complex Process Piping & Vessels

A highly complex interior process area featuring interconnected large-diameter pipes, massive pressurized vessels, automated control valves, and multi-level grated walkways. Showcases our capability in delivering high-density mechanical installations.

Green Steel Structure with Pipes
Infrastructure Construction
View Details
Elevated Pipe Rack

Structural Steel & Pipe Routing

Detailed view of an elevated pipe rack system. Precision-fabricated green structural steel beams provide robust support for multiple parallel pipe runs, demonstrating meticulous alignment and structural integrity.

Worker Grinding Pipe Elbow
Mechanical
View Details
Fabrication Yard

Pipe Joint Preparation & Grinding

A skilled fabricator utilizing a heavy-duty angle grinder to bevel and prepare the edges of a massive steel pipe elbow. This critical preparation ensures optimal penetration for the subsequent structural welding process.

Blue Valve Installation
Mechanical Construction
View Details
Elevated Process Structure

Heavy Valve & Equipment Installation

Specialist rigging team carefully maneuvering a large, heavy-duty blue control valve into position within a complex elevated structural framework, coordinating precise alignment with existing pipe flanges.

Wide Angle Green Structure
Infrastructure
View Details
Heavy Pipe Rack Corridor

Massive Pipe Rack Erection

Wide perspective of an extensive, multi-level green structural steel pipe rack spanning across the facility. Massive concrete foundations provide essential support for this critical plant infrastructure.

Vertical Silo Installation
Mechanical Construction
View Details
High Elevation Works

High-Level Silo & Duct Assembly

Specialist rigging crews operating at extreme heights to install large vertical ducting systems connected to a top-level silo unit. Demonstrates our expertise in complex, high-elevation mechanical installations.

Vertical Structure View 1
Infrastructure
View Details
Structural Towers

Multi-Tiered Structural Framework

A towering perspective of the primary structural steel framework. Engineered to support extreme static and dynamic loads, this multi-tiered green structure forms the backbone of the processing facility.

Vertical Structure View 2
Infrastructure
View Details
Process Tower Center

Process Tower Structural Erection

Another striking angle of the main structural towers during the erection phase. Precision alignment of vertical columns and horizontal cross-bracing ensures maximum stability before equipment installation.

Seamless Carbon Steel Pipes
Mechanical
View Details
Material Staging Area

High-Spec Carbon Steel Piping

Heavy-duty, thick-walled seamless carbon steel pipes (DN200) staged under protective tarps at the site. These high-specification materials are crucial for handling extreme high-pressure process fluids.

Zoomlion Crane Lifting Pipes
Infrastructure
View Details
Site Staging Area

Heavy Material Handling

A Zoomlion mobile crane expertly maneuvering heavy, large-diameter steel pipes at the main staging area. Efficient material handling logistics are essential for keeping our large-scale construction schedules on track.

Elevated Pipe Rack Hoisting
Mechanical Construction
View Details
Elevated Pipe Rack

Complex Pipe Routing & Rigging

Wide perspective down a massive elevated green pipe rack showing complex multi-level pipe routing. Specialized manual rigging and chain hoists are utilized to maneuver heavy pipe sections into tight clearances.

Chain Hoist Operation on Pipe Rack
Mechanical
View Details
Pipe Rack Level 2

Precision Pipe Alignment

Detailed view of manual chain hoist operations on the elevated pipe rack. Our riggers use extreme precision to adjust heavy pipe elevations and ensure perfect flange alignment prior to final bolting and welding.

Vertical Pipe Installation
Mechanical
View Details
Process Tower Shaft

Vertical Process Pipe Erection

Looking down a structural shaft during the installation of a massive vertical process pipe. Rigging this heavy component through multiple structural levels requires intricate coordination and high-level safety standards.